Inner walls, cabling and raised floors

14 Jun
  • Monday 14 June 2021
  • By: BOONS FIS
  • Category: New building

All pipes, ducts and cabling for heating, air conditioning, climate ceiling, ... will be further laid. The workshop is temporarily off-limits so that the floor can dry and harden. In the meantime, the (raised) computer floor is also in place and the walls are being placed. In this way, the various offices and spaces are gradually taking shape. Even in this phase, the beautiful incidence of light is noticeable.