Sewage and leveling

22 Apr
  • Thursday 22 April 2021
  • By:
  • Category: New building

After the remediation work, preparations were made to pour a concrete slab. The ground in the enormous hall has been made nice and flat again. On the outside, we have a first impression of the black and white concept characteristic of our project.