Wall and window profiles, pipes and overhead crane

18 May
  • Tuesday 18 May 2021
  • By: BOONS FIS
  • Category: New building

In this phase, preparations are being made for the layout of the workplace, warehouse, test room and offices. From water pipes, electrical pipes and wall profiles to the overhead crane that is mounted over the entire length of the workplace. The drainage channel for the test room has also already been installed.